The Simulation Centre of the Faculty of Medicine (SIMU) is one of the most esteemed simulation centres in Central Europe. AiD team a.s. partnered with Knauf Ceiling Solutions (formerly Armstrong Ceiling Solutions) to create this latest addition to the Medicine Campus.
Office Building K2
A Modernist Masterpiece with Acoustic Comfort
The Kielecka 2 office building is a six-story building that embodies modernism with its shape and architectural detail. The façade consists of white, rounded profiles that resemble sails and ship architecture, presenting Gdynia style "Streamline" of the 30s.The design highlights the business character of the place and prioritizes the comfort of its users, including acoustic comfort. Metal ceilings were chosen for their durability and high quality. The long, white panels of the METAL B-H 300 system were used to avoid visible divisions between panels, providing an impressive and efficient solution. The panels are perforated and have an acoustical inlay to eliminate reverberation and please both the eyes and ears.
Project Facts
- Architect: APA Wojciechowski
- Contractor: C. Hartwig Gdynia S.A.
- Client: Vastint Poland Sp. z o.o.
- Photography Copyright: © Szymon Polański
Project Information
- Sector: Office
- Room Type: Auditorium, Meeting Room, Conference Room, Cafeteria, Open Office, Collaboration Area, Corridors
- Materials: Metal